Transport Engineering

  • Construction Supervision Of The Design And Build Contract For Strengthening Of Nakasero Roads In Kampala
    The project involved the Supervision of the reconstruction works on approximately 5.45km of city roads with a mechanically modified sub-base, crushed stone base, asphalt surfacing, drainage works, street lighting and ancillary works.  
  • Consultancy Services For Continuation Of Supervision Of Staged Reconstruction Of Lots D&E : Tororo-Mbale And Mbale-Soroti Roads
    The project involved the development of different options for the dual design (including options for accessing the frontage businesses, pedestrian facilities, drainage, traffic flow from the various access roads) and preparation of the options report.  
  • Construction Supervision Of Rehabilitation Of Selected National Roads: Nakalama-Tirinyi-Mbale Road (102KM)
    This involved road condition evaluation, design of interventions, partial reconstruction of failed sections and an asphalt overlay on the entire road, reconstruction of failed shoulders, provision of bus bays and ancillary works.  
  • Feasibility Study And Detailed Engineering Design For Kampala-Bombo Express Highway
    The Project Involves the route selection feasibility study and detailed design of a 30km dual carriageway arterial road, Together with interchanges ,drainage designs and social and environmental impact assessements
  • Construction Supervision Of Jinja-Kamuli Road Periodic Maintenance Works
    Supervision of the construction works of the approximately 58km of an originally double surface treated Jinja -Kamuli road in Eastern Uganda, involving reprocessing and modification of the existing surfacing and base with crashed stone to existing surfacing.  
  • Design Review And Update And Detailed And Construction Supervision Of Road Upgrading And Junction Improvement Works In Kampala
    Detailed design and construction supervision of Road upgrading for 6 road links from gravel to bitumen standard as well as design of signalized junctions in kampala
  • Review/Update Of Engineering Designs For Dualling Of Roads (9.2KM) in Kampala
    The project involved re-designing of Makerere Hill Road and 13 no. junctions: redesign of Nakalongo Primary Drainage channel as well as preparation of new designs for Kira road.
  • Kampala-Jinja Road Capacity Improvement Project
    The project involved the feasibility study, detailed engineering design and tender assistance for the capacity improvement of Kampala - Jinja road (72km approx).In the course of the study, alternative new alignments were investigated.