The Challenges

The project involved the construction of spring protection works; 2Nr. Borehole pump installation; Installation of 100m3 Reservoir Tank; 3.5km Transmission Main of OD110mm and OD90mm pipeline; 28km Distribution Main ranging from OD 160mm to 32mm and Eco-San toilets.

Project Description