The Challenges
The project under the Ministry of Energy and Mineral Development and funded by UNDP and GEF comprised of conducting a detailed technical feasibility study to establish whether the biogas plant at the Nakivubo WWTP can be enhanced to enhance biogas production for electricity generation using an Integrated Waste Management (IWM) approach.