+256 393 513 038 Mon – Fri: 8:00am-5pm Sat-8:00am-1pm pec@pec.co.ug

  • facebook
  • linkedin
  • twitter
logo
  • Home
  • About us
    • About the Company
    • Company Core Values
    • Quality Policy & Quality objectives
    • Occupational Safety & Health Policy
    • Available Equipment and Software Resources
  • Services
    • Transport Engineering Division
    • Water and Waste Water
    • Surveying/GIS Division
    • Structural Engineering Division
    • Environment Division
    • Materials and Geotechnical Engineering Division
  • Our Core Team
    • Core Company Staff
    • Organisational Structure
  • Projects
    • Transport Engineering
    • Water Engineering
    • Structural Engineering
    • Survey, Mapping & GIS
  • Contact
  • Webmail

  • Home
  • Projects
  • Design Review and Supervision of Construction Works for Kanyampanga Gravity Flow Water Scheme (Jul 2012 – Aug 2017)

    Kanyampanga Gravity Flow Scheme covers 5 sub-counties (Kihihi, Kanyantorogo, Nyamirama and Mukono) of Kanungu district found in Western Uganda. The works consist of sources works, 7 reservoirs with total capacity of 560m3, several break-pressure tanks, 220 Km of pipeline (transmission and primary distribution network) and over 1,000 connections. The assignment involved undertaking design review and […]

  • Technical Feasibility Studies for the Enhancement of Biogas Production at Nakivubo Wastewater Treatment Plant (Nov 2020 – Ongoing)

    The project under the Ministry of Energy and Mineral Development and funded by UNDP and GEF comprised of conducting a detailed technical feasibility study to establish whether the biogas plant at the Nakivubo WWTP can be enhanced to enhance biogas production for electricity generation using an Integrated Waste Management (IWM) approach.  

  • Kampala Sanitation Program Lake Victoria Protection Phase I &II (April 2010 – Ongoing)

    The Project involved design, preparation of tender documents and construction supervision for the Nakivubo and Kinawataka waste water treatments plants for NWSC -Kampala area: Design of two waste water treatment plant: -45,000m3/d (Nakivubo) and 9,000m3/d (Kinawataka)

  • Construction Supervision Of The Design And Build Contract For Strengthening Of Nakasero Roads In Kampala (Dec 2012 – 2014)

    The project involved the Supervision of the reconstruction works on approximately 5.45km of city roads with a mechanically modified sub-base, crushed stone base, asphalt surfacing, drainage works, street lighting and ancillary works.

  • Engineering Supervision Of Construction Works For Lukalu – Kabasanda Gravity Flow Scheme

    The project involved the construction of spring protection works; 2Nr. Borehole pump installation; Installation of 100m3 Reservoir Tank; 3.5km Transmission Main of OD110mm and OD90mm pipeline; 28km Distribution Main ranging from OD 160mm to 32mm and Eco-San toilets.

  • Bushenyi-Sheema Water Supply And Sanitation Project (Sep 2014 – Aug 2017)

    The Project Involved Updating The Feasibility Study And Detailed Design Of Kitagata Water Treatment Plant With A Capacity Of 9450 M3/Day For A Population Of 252,000; Design Of Transmission Mains -Approx 102km; And Construction Supervision Of Phase One Works.

  • Kampala-Jinja Road Capacity Improvement Project (2010 – Jul 2014)

    The project involved the feasibility study, detailed engineering design and tender assistance for the capacity improvement of Kampala – Jinja road (72km approx).In the course of the study, alternative new alignments were investigated.

  • Kampala Sanitation Programme Lake Victoria Protection Phase I &II (April 2010 – Ongoing)

    Design and Construction Supervision of Nakivubo (12km) and Kinawataka (18km) trunk sewer lines with pipeline diameters ranging from ND 1500mm to ND 300mm for National Water and Sewerage Services (NWSC) – Kampala Area under the Protection of Lake Victoria Phase II (PLV II) project.  

  • Review/Update Of Engineering Designs For Dualling Of Roads (9.2KM) in Kampala (Sep 2013 -Dec 2013)

    The project involved re-designing of Makerere Hill Road and 13 no. junctions: redesign of Nakalongo Primary Drainage channel as well as preparation of new designs for Kira road.

  • Design Review & Update & Detailed Design & Construction Supervision Of Road Upgrading & Junction Improvement Works In K’la (Apr 2010 – Dec 2013)

    The project involved detailed design and Construction Supervision of Road Upgrading for 6 road links from gravel to bitumen standard as well as design of signalized Junction Improvement Works on 7 selected junctions in Kampala City.  

  • 1
  • 2
  • →

About Us

PEC clearly appreciates the importance of personnel in the engineering consultancy industry. Consequently, the company's core staff represents the best qualifications and skills in their respective professional fields in the Ugandan market today.

  • facebook
  • linkedin
  • twitter

FACEBOOK

Office Location

Plot 9, Makajja Close off Ntinda 2 Road, Naguru, Kampala Uganda , P.O. Box 9529, Kampala Uganda (East Africa).

+256 393 513 038

pec@pec.co.ug & pecuganda@gmail.com

Mon - Fri: 8:00 - 17:00

Sat: 8:00 - 1:00 pm

Copyright 2022 Professional Engineering Consultants Limited. All rights reserved.
Go to top