Kampala Sanitation Program Lake Victoria Protection Phase I &II
The Project involved design, preparation of tender documents and construction supervision for the Nakivubo and Kinawataka waste water treatments plants for NWSC -Kampala area: Design of two waste water treatment plant: -45,000m3/d (Nakivubo) and 9,000m3/d (Kinawataka)
-
Construction Supervision Of The Design And Build Contract For Strengthening Of Nakasero Roads In Kampala
The project involved the Supervision of the reconstruction works on approximately 5.45km of city roads with a mechanically modified sub-base, crushed stone base, asphalt surfacing, drainage works, street lighting and ancillary works.
-
Engineering Supervision Of Construction Works For Lukalu – Kabasanda Gravity Flow Scheme
The project involved the construction of spring protection works; 2Nr. Borehole pump installation; Installation of 100m3 Reservoir Tank; 3.5km Transmission Main of OD110mm and OD90mm pipeline; 28km Distribution Main ranging from OD 160mm to 32mm and Eco-San toilets.
-
Review/Update Of Engineering Designs For Dualling Of Roads (9.2KM) in Kampala
The project involved re-designing of Makerere Hill Road and 13 no. junctions: redesign of Nakalongo Primary Drainage channel as well as preparation of new designs for Kira road.
-
Design Review And Update And Detailed And Construction Supervision Of Road Upgrading And Junction Improvement Works In Kampala
Detailed design and construction supervision of Road upgrading for 6 road links from gravel to bitumen standard as well as design of signalized junctions in kampala
-
Construction Supervision Of Jinja-Kamuli Road Periodic Maintenance Works
Supervision of the construction works of the approximately 58km of an originally double surface treated Jinja -Kamuli road in Eastern Uganda, involving reprocessing and modification of the existing surfacing and base with crashed stone to existing surfacing.
-
Feasibility Study And Detailed Engineering Design For Kampala-Bombo Express Highway
The Project Involves the route selection feasibility study and detailed design of a 30km dual carriageway arterial road, Together with interchanges ,drainage designs and social and environmental impact assessements