+256 393 513 038 Mon – Fri: 8:00am-5pm Sat-8:00am-1pm pec@pec.co.ug

  • facebook
  • linkedin
  • twitter
  • plus
logo
  • Home
  • About us
    • About the Company
    • Company Core Values
    • Quality Policy & Quality objectives
    • Occupational Safety & Health Policy
    • Available Equipment and Software Resources
  • Services
    • Transport Engineering Division
    • Water and Waste Water
    • Surveying/GIS Division
    • Structural Engineering Division
    • Environment Division
    • Materials and Geotechnical Engineering Division
  • Our Core Team
    • Core Company Staff
    • Organisational Structure
  • Projects
    • Transport Engineering
    • Water Engineering
    • Structural Engineering
    • Survey, Mapping & GIS
  • Contact
  • Webmail

  • Home
  • Projects
  • Kampala Sanitation Program Lake Victoria Protection Phase I &II

    The Project involved design, preparation of tender documents and construction supervision for the Nakivubo and Kinawataka waste water treatments plants for NWSC -Kampala area: Design of two waste water treatment plant: -45,000m3/d (Nakivubo) and 9,000m3/d (Kinawataka)

  • Construction Supervision Of The Design And Build Contract For Strengthening Of Nakasero Roads In Kampala

    The project involved the Supervision of the reconstruction works on approximately 5.45km of city roads with a mechanically modified sub-base, crushed stone base, asphalt surfacing, drainage works, street lighting and ancillary works.

  • Engineering Supervision Of Construction Works For Lukalu – Kabasanda Gravity Flow Scheme

    The project involved the construction of spring protection works; 2Nr. Borehole pump installation; Installation of 100m3 Reservoir Tank; 3.5km Transmission Main of OD110mm and OD90mm pipeline; 28km Distribution Main ranging from OD 160mm to 32mm and Eco-San toilets.

  • Bushenyi-Sheema Water Supply And Sanitation Project

    The Project Involves Updating Of Feasibility Study And Detailed Design Of Kitagata Water Treatment Plant With A Capacity Of 9450 M3/Day For A Population Of 252,000; Design Of Transmission Mains -Approx 102km; And Construction Supervision Of Phase One Works.

  • Kampala-Jinja Road Capacity Improvement Project

    The project involved the feasibility study, detailed engineering design and tender assistance for the capacity improvement of Kampala – Jinja road (72km approx).In the course of the study, alternative new alignments were investigated.

  • Kampala Sanitation Programme Lake Victoria Protection Phase I &II

    The Project involved design, preparation of tender documents and construction supervision for the Nakivubo and Kinawataka waste water treatments plants for NWSC -Kampala area: Design of two waste water treatment plant: -45,000m3/d (Nakivubo) and 9,000m3/d (Kinawataka)  

  • Review/Update Of Engineering Designs For Dualling Of Roads (9.2KM) in Kampala

    The project involved re-designing of Makerere Hill Road and 13 no. junctions: redesign of Nakalongo Primary Drainage channel as well as preparation of new designs for Kira road.

  • Design Review And Update And Detailed And Construction Supervision Of Road Upgrading And Junction Improvement Works In Kampala

    Detailed design and construction supervision of Road upgrading for 6 road links from gravel to bitumen standard as well as design of signalized junctions in kampala

  • Construction Supervision Of Jinja-Kamuli Road Periodic Maintenance Works

    Supervision of the construction works of the approximately 58km of an originally double surface treated Jinja -Kamuli road in Eastern Uganda, involving reprocessing and modification of the existing surfacing and base with crashed stone to existing surfacing.  

  • Feasibility Study And Detailed Engineering Design For Kampala-Bombo Express Highway

    The Project Involves the route selection feasibility study and detailed design of a 30km dual carriageway arterial road, Together with interchanges ,drainage designs and social and environmental impact assessements

  • 1
  • 2
  • →

About Us

PEC clearly appreciates the importance of personnel in the engineering consultancy industry. Consequently, the company's core staff represents the best qualifications and skills in their respective professional fields in the Ugandan market today.

  • facebook
  • linkedin
  • twitter
  • plus

Facebook

Office Location

Plot 9, Makajja Close off Ntinda 2 Road, Naguru, Kampala Uganda , P.O. Box 9529, Kampala Uganda (East Africa).

+256 393 513 038

pec@pec.co.ug & pecuganda@gmail.com

Mon - Fri: 8:00 - 17:00

Sat: 8:00 - 1:00 pm

Copyright 2020 Professional Engineering Consultants Limited. All rights reserved.
Go to top