Design Review and Supervision of Construction Works for Kanyampanga Gravity Flow Water Scheme (Jul 2012 – Aug 2017)
Kanyampanga Gravity Flow Scheme covers 5 sub-counties (Kihihi, Kanyantorogo, Nyamirama and Mukono) of Kanungu district found in Western Uganda. The works consist of sources works, 7 reservoirs with total capacity of 560m3, several break-pressure tanks, 220 Km of pipeline (transmission and primary distribution network) and over 1,000 connections. The assignment involved undertaking design review and […]
-
Technical Feasibility Studies for the Enhancement of Biogas Production at Nakivubo Wastewater Treatment Plant (Nov 2020 – Ongoing)
The project under the Ministry of Energy and Mineral Development and funded by UNDP and GEF comprised of conducting a detailed technical feasibility study to establish whether the biogas plant at the Nakivubo WWTP can be enhanced to enhance biogas production for electricity generation using an Integrated Waste Management (IWM) approach.
-
Kampala Sanitation Program Lake Victoria Protection Phase I &II (April 2010 – Ongoing)
The Project involved design, preparation of tender documents and construction supervision for the Nakivubo and Kinawataka waste water treatments plants for NWSC -Kampala area: Design of two waste water treatment plant: -45,000m3/d (Nakivubo) and 9,000m3/d (Kinawataka)
-
Construction Supervision Of The Design And Build Contract For Strengthening Of Nakasero Roads In Kampala (Dec 2012 – 2014)
The project involved the Supervision of the reconstruction works on approximately 5.45km of city roads with a mechanically modified sub-base, crushed stone base, asphalt surfacing, drainage works, street lighting and ancillary works.
-
Engineering Supervision Of Construction Works For Lukalu – Kabasanda Gravity Flow Scheme
The project involved the construction of spring protection works; 2Nr. Borehole pump installation; Installation of 100m3 Reservoir Tank; 3.5km Transmission Main of OD110mm and OD90mm pipeline; 28km Distribution Main ranging from OD 160mm to 32mm and Eco-San toilets.
-
Review/Update Of Engineering Designs For Dualling Of Roads (9.2KM) in Kampala (Sep 2013 -Dec 2013)
The project involved re-designing of Makerere Hill Road and 13 no. junctions: redesign of Nakalongo Primary Drainage channel as well as preparation of new designs for Kira road.
-
Design Review & Update & Detailed Design & Construction Supervision Of Road Upgrading & Junction Improvement Works In K’la (Apr 2010 – Dec 2013)
The project involved detailed design and Construction Supervision of Road Upgrading for 6 road links from gravel to bitumen standard as well as design of signalized Junction Improvement Works on 7 selected junctions in Kampala City.