Industry: Transport

Construction supervision of Road Upgrading and Junction Improvement Works in Kampala City under Batch 1A, KIIDP2 – Junctions: Signalisation of 10 Junctions (1 at Fairway, 3 at Kira Road, 1 at Bwaise, 3 at Makerere Hill Road and 2 at Bakuli-Nakulabye-Kasubi Road) and 2 independent pedestrian crossings Links: Kiira Road, Mambule Road, Makerere Hill Road, Bakuli-Nakulabye-Kasubi Road, Nsalo Road, Kyadondo Road (9.26 Km)

Kampala, Uganda

Construction supervision of Road Upgrading and Junction Improvement Works in Kampala City under Batch 1A, KIIDP2 – Junctions: Signalisation of 10 Junctions (1 at Fairway, 3 at Kira Road, 1 at Bwaise, 3 at Makerere Hill Road and 2 at Bakuli-Nakulabye-Kasubi Road) and 2 independent pedestrian crossings Links: Kiira Road, Mambule Road, Makerere Hill Road, Bakuli-Nakulabye-Kasubi Road, Nsalo Road, Kyadondo Road (9.26 Km)

Client

Kampala Capital City Authority

Funder

The World Bank

Value of services

USD 1,560,000

Start / End Dates

June 2015 - April 2018

The project involved the Supervision of Construction Works for road upgrading, road reconstruction and improvement of Junctions as follows: • Fairway JCT: 0.52Km of Main Alignment was dualled to 4 lanes; plus 0.49Km of Main Junction Legs; • Segment of Kira Road 1.1Km of main alignment was dualled to 4 lanes; plus 0.53Km length of Main Junction Legs; • Mambule Road 0.62Km length upgraded to Bitumen Standard; • Bwaise Junction 0.43Km length of Main Alignment was dualled to 4 lanes; plus 0.15Km of Main Junction Legs; • Makerere Hill Road: 1.62 Km of Main Alignment was dualled to 4 lanes plus 0.6Km of Main Junction Legs; • Bakuli-Nakulabye-Kasubi Road: 2.23Km of Main Alignment was dualled to 4 lanes; plus 0.56Km of Main Junction Legs; • Nsalo Road 0.35Km of single carriageway road was reconstructed to Bitumen Standard; • Kyadondo Road: 0.42Km of single carriageway road was reconstructed to bitumen standard; and • Signalisation of 12 Junctions (1 at Fairway, 3 at Kira Road, 1 at Bwaise, 5 at Makerere Hill Road and 2 at Bakuli-Nakulabye-Kasubi Road) The paving material for all the roads was Asphalt Concrete. The total length of road sections whose capacity was improved (dualled) is 5.9Km

Planning, feasibility, conceptual design
Design
Construction
Operations and maintenance
Decommissioning
Old-Kiira Road Junction

Old-Kiira Road Junction

Kabira Junction

Kabira Junction