Consultancy Services for Construction Supervision of the Design and Build Contract for the Upgrading of Kira-Matugga Road (21.3 Km) and Improvement of 5 No. Junctions – Lot 1
Kampala, Uganda

Client
Ministry of Works and Transport
Funder
Government of Uganda
Value of services
Start / End Dates
May 2024 - Ongoing
The project involves design review and supervision of the design and build contract for; upgrading of the Kira – Kasangati – Matugga and Buwate Spur road sections (19.2 Km) from unpaved to paved standard; capacity improvement (dualling) of the Kyaliwajalla – Kira road section (2.1 Km); and capacity improvement of several online and offline junctions through grade-separation and/or signalisation. The proposed paving material for the road is Asphalt Concrete.
Challenge
The project involves design review and supervision of the design and build contract for; upgrading of the Kira – Kasangati – Matugga and Buwate Spur road sections (19.2 Km) from unpaved to paved standard; capacity improvement (dualling) of the Kyaliwajalla – Kira road section (2.1 Km); and capacity improvement of several online and offline junctions through grade-separation and/or signalisation. The proposed paving material for the road is Asphalt Concrete.
Solution
The project involves design review and supervision of the design and build contract for; upgrading of the Kira – Kasangati – Matugga and Buwate Spur road sections (19.2 Km) from unpaved to paved standard; capacity improvement (dualling) of the Kyaliwajalla – Kira road section (2.1 Km); and capacity improvement of several online and offline junctions through grade-separation and/or signalisation. The proposed paving material for the road is Asphalt Concrete.


Contractor operations