Industry: Water

Consultancy Services for the Design and Construction Supervision of Bushenyi Water Supply and Sanitation Project

Bushenyi, Uganda

Consultancy Services for the Design and Construction Supervision of Bushenyi Water Supply and Sanitation Project

Client

National Water and Sewerage Cooperation (NWSC)

Funder

French Development Agency (AFD)

Value of services

USD 261,201

Start / End Dates

September 2014 - August 2017

The Project covered Ishaka-Bushenyi municipality, and town councils of Kabwohe- Itendero, Kitagata and Bugongi: with the contract works including the following: • Engineering detailed design and supervision of construction works which comprised of: • Kitagata water treatment works of 3,150m3/day capacity (for Phase 1) with river raw water abstraction, and process including clarification, cadmium removal and disinfection with associated electromechanical works. • Rehabilitation of Nyaruzinga Water Treatment Plant (2,000m3/day capacity) including electromechanical improvements • Pipelaying of 23Km Transmission network (DN 200 – 300mm pipeline) and design of additional 48Km transmission and distribution network of uPVC/HDPE. • Installation of 2Nr. Steel Reservoirs of 1,600m3 capacity with booster station (Kikuba) and 90m3 (Ibanga) capacity • Design of sewer networks and sanitation ponds for Kitagata, Ishaka, Bushenyi and Kabwohe Towns. • Preparation of Tender documents and assistance in Bidding Evaluation for the construction of Phase 1 of the Bushenyi - Sheema Water Supply and Sanitation.

Planning, feasibility, conceptual design
Design
Construction
Operations and maintenance
Decommissioning