Consultancy Services for the Design and Construction Supervision of Bushenyi Water Supply and Sanitation Project
Bushenyi, Uganda

Client
National Water and Sewerage Cooperation (NWSC)
Funder
French Development Agency (AFD)
Value of services
Start / End Dates
September 2014 - August 2017
The Project covered Ishaka-Bushenyi municipality, and town councils of Kabwohe- Itendero, Kitagata and Bugongi: with the contract works including the following: • Engineering detailed design and supervision of construction works which comprised of: • Kitagata water treatment works of 3,150m3/day capacity (for Phase 1) with river raw water abstraction, and process including clarification, cadmium removal and disinfection with associated electromechanical works. • Rehabilitation of Nyaruzinga Water Treatment Plant (2,000m3/day capacity) including electromechanical improvements • Pipelaying of 23Km Transmission network (DN 200 – 300mm pipeline) and design of additional 48Km transmission and distribution network of uPVC/HDPE. • Installation of 2Nr. Steel Reservoirs of 1,600m3 capacity with booster station (Kikuba) and 90m3 (Ibanga) capacity • Design of sewer networks and sanitation ponds for Kitagata, Ishaka, Bushenyi and Kabwohe Towns. • Preparation of Tender documents and assistance in Bidding Evaluation for the construction of Phase 1 of the Bushenyi - Sheema Water Supply and Sanitation.