Industry: Transport
Feasibility Study and Detailed Engineering Design for the Upgrading of Link 1: Rwimi – Dura – Kamwenge (58.6 Km), and Link 2: Nyakabirizi – Nyakashaka – Nsiika (48.3 Km)
Rwimi - Kamwenge, Uganda

Client
Ministry of Works and Transport
Funder
Government of Uganda
Value of services
Start / End Dates
October 2023 - Ongoing
The project involves feasibility study, preliminary and detailed engineering design for the upgrading of the project roads, including ESIA, RAP, cost estimation, and economic appraisal. The project roads traverse a rolling to hilly terrain and characterised by sharp horizontal and vertical curves. The roads also cross a number of environmentally sensitive areas e.g. swamps and game reserves.
Planning, feasibility, conceptual design
Design
Construction
Operations and maintenance
Decommissioning


Drilling at proposed bridge locations and deep cuts