Surveying
- Home
- Surveying
-
Bushenyi-Sheema Water Supply And Sanitation Project (Sep 2014 – Aug 2017)
The Project Involved Updating The Feasibility Study And Detailed Design Of Kitagata Water Treatment Plant With A Capacity Of 9450 M3/Day For A Population Of 252,000; Design Of Transmission Mains -Approx 102km; And Construction Supervision Of Phase One Works.
-
Kampala-Jinja Road Capacity Improvement Project (2010 – Jul 2014)
The project involved the feasibility study, detailed engineering design and tender assistance for the capacity improvement of Kampala – Jinja road (72km approx).In the course of the study, alternative new alignments were investigated.
-
Kampala Sanitation Programme Lake Victoria Protection Phase I &II (April 2010 – Ongoing)
Design and Construction Supervision of Nakivubo (12km) and Kinawataka (18km) trunk sewer lines with pipeline diameters ranging from ND 1500mm to ND 300mm for National Water and Sewerage Services (NWSC) – Kampala Area under the Protection of Lake Victoria Phase II (PLV II) project.
-
Construction Supervision Of The Design And Build Contract For Strengthening Of Nakasero Roads In Kampala (Dec 2012 – 2014)
The project involved the Supervision of the reconstruction works on approximately 5.45km of city roads with a mechanically modified sub-base, crushed stone base, asphalt surfacing, drainage works, street lighting and ancillary works.