Review/Update Of Engineering Designs For Dualling Of Roads (9.2KM) in Kampala
The project involved re-designing of Makerere Hill Road and 13 no. junctions: redesign of Nakalongo Primary Drainage channel as well as preparation of new designs for Kira road.
-
Design Review And Update And Detailed And Construction Supervision Of Road Upgrading And Junction Improvement Works In Kampala
Detailed design and construction supervision of Road upgrading for 6 road links from gravel to bitumen standard as well as design of signalized junctions in kampala
-
Construction Supervision Of Jinja-Kamuli Road Periodic Maintenance Works
Supervision of the construction works of the approximately 58km of an originally double surface treated Jinja -Kamuli road in Eastern Uganda, involving reprocessing and modification of the existing surfacing and base with crashed stone to existing surfacing.
-
Feasibility Study And Detailed Engineering Design For Kampala-Bombo Express Highway
The Project Involves the route selection feasibility study and detailed design of a 30km dual carriageway arterial road, Together with interchanges ,drainage designs and social and environmental impact assessements
-
Construction Supervision Of Rehabilitation Of Selected National Roads: Nakalama-Tirinyi-Mbale Road (102KM)
This involved road condition evaluation, design of interventions, partial reconstruction of failed sections and an asphalt overlay on the entire road, reconstruction of failed shoulders, provision of bus bays and ancillary works.
-
Consultancy Services For Continuation Of Supervision Of Staged Reconstruction Of Lots D&E : Tororo-Mbale And Mbale-Soroti Roads
The project involved the development of different options for the dual design (including options for accessing the frontage businesses, pedestrian facilities, drainage, traffic flow from the various access roads) and preparation of the options report.