Water and Wastewater
-
Engineering Supervision Of Construction Works For Lukalu – Kabasanda Gravity Flow Scheme
The project involved the construction of spring protection works; 2Nr. Borehole pump installation; Installation of 100m3 Reservoir Tank; 3.5km Transmission Main of OD110mm and OD90mm pipeline; 28km Distribution Main ranging from OD 160mm to 32mm and Eco-San toilets.
-
Engineering Supervision of Construction Works for Rwebisengo-Kanara Phase-1 and Lusaku-Kabasanda gravity flow schemes.
The Project comprises of two independent water schemes in two different areas of Uganda; Rwebisengo-Kanara and Lukalu-Kabasanda. The assignment is to provide engineering services for supervision of construction works and transfer of knowledge to client staff.
-
Design Review and Supervision of Construction Works for Kanyampanga Gravity Flow Water Scheme
Kanyampanga Gravity Flow Scheme covers 5 sub-counties (Kihihi, Kanyantorogo, Nyamirama and Mukono) of Kanungu district found in Western Uganda. The works consist of sources works, 7 reservoirs with total capacity of 560m3, several break-pressure tanks, 220 Km of pipeline (transmission and primary distribution network) and over 1,000 connections. The assignment involved undertaking design review and construction supervision.