Engineering sustainable water management solutions
Water

Engineering sustainable water management solutions

Our view on Water

The Water Engineering Division handles feasibility studies, engineering design, tender assistance, and construction supervision for a range of systems. This includes water supply systems (both pumped & gravity flow) , sewer systems (pumped or gravity) , sewage treatment plants , and stormwater collection and disposal facilities.

Eng. Thomas Isanga

Eng. Thomas Isanga

Manager - Water and Environment

Wind turbines on land and sea

Consultancy Services for the Design and Supervision of Rehabilitation Works for 06No. (Six) Predominantly Solar Powered Water Supply Systems in Refugee Hosting Districts of Terego, Madi-Okollo and Yumbe

View project

All Water Projects

IndustryLocationStatusDescription
Consultancy Services for the Design and Supervision of Proposed Optimization Works in Water Supply Areas of Zone 1 of Bidi-bidi Refugee Settlement in Yumbe district
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH represented by German Development Cooperation GIZ
Water
Yumbe, Uganda
USD 265,952.43
Nov 1, 2024
Ongoing
Consultancy Services for the Design and Supervision of Rehabilitation Works for 06No. (Six) Predominantly Solar Powered Water Supply Systems in Refugee Hosting Districts of Terego, Madi-Okollo and Yumbe
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH represented by German Development Cooperation GIZ
Water
Terego, Madi-Okollo & Yumbe, Uganda
USD 252,789.95
Oct 7, 2024
Ongoing
Consultancy for Construction Supervision of 4 ADA Water Supply Systems in Refugee Hosting Areas in the Districts of Terego and Yumbe
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH represented by German Development Cooperation GIZ
Water
Terego & Yumbe, Uganda
USD 108,000
Aug 2, 2023
Ongoing
Consultancy Services for Preliminary Assessment and Detailed Design of Soil and Water Conservation/River Training Structures for Wadelai, Doho and Ngenge Irrigation Schemes Under FIEFOC Program-Project 2
Ministry of Water and Environment
Water
Wadelai, Doho and Ngenge, Uganda
USD 47,114
Nov 15, 2021
Completed
Consultancy for Design and Supervision of Rehabilitation Works for over 20 water supply systems in refugee hosting areas in the districts of Arua (Terego/Madi-Okollo) and Yumbe
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH represented by German Development Cooperation GIZ
Water
Arua (Terego/Madi-Okollo) and Yumbe, Uganda
USD 567,823
Jul 12, 2021
Completed
Consultancy Services for feasibility studies and Detailed Design of Medium and Large Scale Irrigation Schemes Covering Lot 2: South Western Highlands
Ministry of Water and Environment
Water
South Western Highlands, Uganda
USD 827,229.5
Jun 7, 2021
Ongoing
Consultancy for Water Supply Systems’ Assets Inventory and Condition Assessment of the Water Supply Systems in the refugee settlements in Arua (Terego), Madi-Okolo and Yumbe District
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH represented by German Development Cooperation GIZ
Water
Arua (Terego), Madi-Okolo & Yumbe District, Uganda
USD 212,670
Jul 6, 2020
Completed
Consultancy Services to Conduct Technical Feasibility Studies for the Enhancement of Biogas Production at National Water and Sewerage Corporation Nakivubo Wastewater Treatment Plant
National Water and Sewerage Cooperation (NWSC)
Water
kampala, Uganda
USD 98,991
Apr 1, 2020
Completed
Detailed Design and Construction Supervision for the Development of Water and Sanitation Infrastructure for the Mbarara & Masaka Areas – Package 2: Mbarara
National Water and Sewerage Cooperation (NWSC)
Water
Mbarara & Masaka, Uganda
USD 664,105
Jun 17, 2019
Ongoing
Engineering Supervision of Construction Works for Rwebisengo-Kanara Phase I Gravity Flow Scheme
Ministry of Water and Environment
Water
Ntororoko, Butambala, Uganda
USD 573,195
Aug 14, 2017
Completed
Consultancy Services for the Design and Construction Supervision of Bushenyi Water Supply and Sanitation Project
National Water and Sewerage Cooperation (NWSC)
Water
Bushenyi, Uganda
USD 261,201
Sep 22, 2014
Completed
Kanyampanga Gravity flow scheme - Design Review and Construction Supervision.
Ministry of Water and Environment
Water
Kanyampanga , Uganda
USD 230,000
Jul 9, 2012
Completed
Protection of Lake Victoria I & II” – Design, Preparation of Tender Documentations and Construction Supervision of Nakivubo Wastewater Treatment Plant and Kinawataka Pre-treatment Plant and Trunk Sewer Lines
National Water and Sewerage Cooperation (NWSC)
Water
Kampala, Uganda
USD 2,791,857.76
Apr 4, 2011
Completed

Rows per page

Page 1 of 1

Contact us

Get in touch for

Water services

Eng. Thomas Isanga

Eng. Thomas Isanga

Manager - Water and Environment

PEC employee
Come work with us

Help build solutions that matter